Manajemen Risiko Perencanaan Optimalisasi Pembangunan Jembatan Utama PT Wijaya Karya dengan Metode Failure Mode and Effect Analysis
DOI:
https://doi.org/10.33479/jtiumc.v1i2.9Kata Kunci:
Construction, Failure Mode and Effect Analysis, Risk managementAbstrak
PT. Wijaya Karya, a construction company engaged in infrastructure development, is facing the challenge of managing risks in its upcoming project to construct the Main Bridge at Soekarno Hatta Airport, Tangerang, Banten. Poor risk management can result in losses in terms of time, finance, and project outcomes. The study aims to design a risk management system to identify and prioritize risks to be addressed by PT. Wijaya using the Failure Mode and Effect Analysis method. The research results show that the risk of changes in work schedule has the greatest impact on the project and should be handled with the assistance of planning consultant experts. The Construction Department will closely monitor the project results to identify and address any risks that arise. Proper risk management is crucial to ensure the successful completion of the project. This abstract highlights the importance of effective risk management in construction projects, especially in infrastructure development.
Referensi
I. Setyadi. 2013, Analisis Penyebab Kecacatan Celana Jeans dengan Menggunakan Metode Fault Tree Analysis (FTA) dan Failure Mode and Effect Analysis (FMEA) di CV Fragile Din Co. Universitas Widyatama, Bandung
Kerzner, H. 2001, Project Management,A Syestem Approach to Planning, Scheduling and Controlling. Seventh edition, John Wiley & Sons. Inc. New York
PT. Wijaya Karya (Persero) Tbk. 2016, Annual Report 2016-PT. Wijaya Karya Tbk (Manajemen Risiko). PT. Wijaya Karya Flipbook. Jakarta
Utari, Dian Kartika. 2008, Analisis Manajemen Risiko (Risiko Operasional) dan Simulasi Monte Carlo di Industri Makanan Daging Olahan. Skripsi Departemen Teknik Industri, Universitas Indonesia, Depok.
Project Management Institute 2000, A Guide to Project Management Body of Knowlegde, Newton Square, Pennsylvania
Flagnan, R. And Norman, G. (2001), Risk Management and Construction, Blackwell Science Ltd. Oxford, New York