This study addresses the changes in production layout at PT NS Bluescope Lysaght Indonesia, caused by the relocation of the factory to a wider land and the use of a different crane. The new factory utilizes Gantry Crane that uses rails on the production floor, which limits the land used. The study uses the Computerized Relationship Layout Planning (Corerap) algorithm to propose alternative production layouts. Four layout proposals were generated, and the layout proposal with the smallest product transfer distance was selected. The results showed that layout proposal 4 was the most effective and efficient, with a total displacement range of 453.7 meters. This study highlights the importance of using advanced algorithms to optimize production layouts, particularly when changes in equipment and facilities occur. The proposed layout can potentially increase productivity and efficiency in production. The study contributes to the body of knowledge on production layout planning and optimization using computerized algorithms.

References

Agustina. D., Maukar. A.L., & Dewi. D. R. S. (2007). Perencanaan produksi dan perbaikan tata letak di PT Berkat Anugrah Alam Cemerlang. Widya Teknik, 6(2), 184-195. https://doi.org/10.33508/wt.v6i2.1253

Andryzio, Mustofa, F.H., & Fitria, L. (2014). Usulan perancangan tata letak fasilitas dengan menggunakan metode automated layout design program (ALDEP) di CV. Kawani Tekno Nusantara. Reka Integra, 2(4), 365-376.

Apple, J. M. (1990). Tata letak pabrik dan pemindahan barang (3rd ed.). Bandung: Institut Teknologi Bandung.

Dwianto. Q.A., Susanty, S., & Fitria. L. (2016). Usulan tata letak fasilitas dengan menggunakan metode Computerized Relationship Layout Planning (CORELAP) di perusahaan konveksi. Jurnal Online Institut Teknologi Nasional, 4(1), 87-97.

Eunike, A., Setyanto, N.W., Yuniarti, R., Hamdala, I., Lukodono, R.P., & Fanani A.A. (2018). Perencanaan produksi dan pengendalian persediaan. Malang: UB Press.

Hadiguna, R.A., & Setiawan, H. (2008). Tata letak pabrik. Yogyakarta: Penerbit Andi.

Heizer, J., & Render, B. (2011). Operations management (10th ed.). New jersey: Pearson.

Heragu, S. S. (2016). Facilities design (4th ed.). New York: CRC Press.

Hiregoudar, C., & Reddy, B.R. (2007). Facility planning and layout design. Pune: Technical Publications.

Lugito, A. W., & Oktiarso. T. (2014). Perancangan tata letak yang optimal menggunakan algoritma corelap dan metode graph-based construction. Symbol, 1(1), 81-94.

Meyers. F. E., & Stephens. M.P. (2013). Manufacturing facilities design and material handling (5th ed.). Pearson Education, Inc.

Pramono, M. & Widyadana, I. G. A. (2015). Perbaikan tata letak fasilitas departemen sheet metal 1 PT MCP. Jurnal Titra, 2(3), 347-352.

Purnomo, H. (2004). Perencanaan dan perancangan fasilitas. Yogyakarta: Graha Ilmu.

Ristono, A. (2004). Perencanaan dan perancangan fasilitas. Yogyakarta: Graha Ilmu.

Sodikin, I., & Mashuri, A. (2012). Penjadwalan produksi pada sistem manufaktur repetitive make to order flow shop melalui pendekatan theory of constraints. Jurnal Teknologi Technoscientia, 4(2), 173-183. https://doi.org/10.34151/technoscientia.v4i2.510.

Tompkins, J. A., White J. A., Bozer. Y. A., & Tanchoco. J. M.A. (2010). Facilities planning (4th ed.). New York: John Wiley & Sons.

Wignjosoebroto, S. (1995). Ergonomi, studi gerak dan waktu. teknik analisis untuk peningkatan produktivitas kerja. Jakarta: Guna Widya.

Wignjosubroto, S. (2003). Pengantar teknik dan manajemen industri. Surabaya: Guna Widya.

Downloads

Published

12.12.2022