Analisis Manajemen Risiko di CV Ladang Management Menggunakan Model House of Risk (HOR)

Authors

  • Teguh Oktiarso Industrial Engineering Universitas Ma Chung
  • Immanuel Nathaniel Ondang Industrial Engineering Universitas Ma Chung
  • Sunday Noya Industrial Engineering Universitas Ma Chung https://orcid.org/0000-0002-2377-4725

DOI:

https://doi.org/10.33479/jtiumc.v2i2.31

Keywords:

Mitigation plans, House of Risk, Risk management

Abstract

Risk management is crucial to minimize the negative effects of potential risks on business processes and operations. In this study, CV Ladang Management, an individual bussiness in the advertising industry, implemented the House of Risk model to identify risk agents and develop appropriate mitigation plans. The analysis of data obtained through this model revealed 15 risk events and 15 risk agents that can affect the company's business processes. Based on the prioritization of risks, 7 priority risk agents were identified, and 11 mitigation plans were proposed to address them. The plans include measures such as choosing tailors with optimal distances and investing in sewing machines for each tailor. By implementing these mitigation plans, CV Ladang Management can reduce the impact of potential risks and ensure the continuity of its business operations.

References

Jutner, U., Peck, H., Christopher, M., 2003. Supply chain risk management: outlining an agenda for future research. Internasional Journal of Logistic: Research and Application, Volume 6(4), pp. 197-210

Pujawan, I.N., Geraldin, L.H., 2009. House of risk: a model for proactive supply chain risk management. Business Process Management Journal, Volume: 15(6), pp. 953-967

Irmawati, 2007. Pengaruh manajemen rantai pasokan terhadap kinerja di PTPN VIII Gunung Mas Bogor. Skripsi, Fakultas Ekonomi dan Manajemen, Institut Pertanian Bogor

Pujawan, I.N., 2005. Supply chain management. Guna Widya, Surabaya

Sofyan, I., 2005. Manajemen risiko. Graha Ilmu, Yogyakarta

Zsidisin, G., Ritchie, B., 2009. Supply chain risk (a handbook of assesment). Spinger, Amerika Serikat

Smith, G. M., 2004. Statistical process control and quality improvement, 5th ed., Pearson Prentice Hall, New Jersey

Nasurullah, 2009. Peningkatan kualitas produksi outsole sepatu dengan menggunakan model six sigma di divisi bottom PT Parkland World Indonesia. Tugas Sarjana, Program Studi Teknik Industri, Universitas Indonusa Esa Unggul, Jakarta

Peorwanto, G. H., 2012. 6 Diagram fishbone. Tersedia online di : <https://sites.google.com/site/kelolakualitas/Diagram-Fishbone> (diakses tanggal 22 Februari 2019)

Downloads

Published

12.12.2022